Title | Elevated Pedestrian Corridor in Yuen Long Town connecting with Long Ping Station, |
Document number | 1551334131.4257 |
Publication date | 25.02.2019 |
Reference | HY/2018/03 |
Authority name | Highways Department |
Country | Hong Kong |
Type of authority | 1 - Ministry or any other national or federal authority |
Deadline | 26.04.2019 |
Contract | 1 - Public Works |
Procedure | 2 - Restricted procedure |
Document | 3 - Contract notice |
Regulation | 7 - WTO |
CPV code | 45000000 - Construction work |
NUTS code | |
Main activity | |
Text |
The works mainly comprise: construction of a covered elevated pedestrian corridor of about 540 metres (m) long and 6 m clear width along the Yuen Long Town Nullah from the West Rail Long Ping Station to the south of Kau Yuk Road; construction of six pedestrian connectivity platforms adjacent to Yuen Long On Ning Road, Castle Peak Road – Yuen Long and Kau Yuk Road with staircases, lifts and escalators to connect the covered elevated pedestrian corridor with the existing at-grade footpaths; and associated road, drainage, utilities, public lighting, landscaping, and electrical and mechanical works. The works are scheduled to commence in July 2019 and will take about 50 months to complete. Mr. Eric Chan Ove Arup and Partners Hong Kong Limited at Level 5, Festival Walk, 80 Tat Chee Avenue, Kowloon Tong, Hong Kong
Telephone No.: (852) 2268 3595 Fax No.: (852) 2268 3953 Email: eric.chan@arup.com |
Attachments |