Title Central Kowloon Route – Central Tunnel,
Document number 1545189922.456
Publication date 17.12.2018
Reference HY/2018/08
Authority name Highways Department
Country Hong Kong
Type of authority 1 - Ministry or any other national or federal authority
Deadline 08.03.2019
Contract 1 - Public Works
Procedure 2 - Restricted procedure
Document 3 - Contract notice
Regulation 7 - WTO
CPV code 45000000 - Construction work
NUTS code
Main activity
Text

The works mainly comprise:

construction of an approximately 2.8km long dual 3-lane Central Kowloon Route central tunnel;

construction of an approximately 1.5km long pilot tunnel with minimum size of 5m internal diameter by tunnel boring machine;

construction of approximately 41m long and 33m long cut-and-cover tunnels at Yau Ma Tei and Ma Tau Kok respectively;

construction of a ventilation shaft, adit and foundation for ventilation building at Ho Man Tin;

slope maintenance and upgrading works;

associated drainage and geotechnical instrumentation and monitoring work;

associated ground investigation work;

construction of civil engineering provisions and coordination with tunnel electrical & mechanical system installation and traffic control and surveillance system installation; and

arrange and implement cross-boundary disposal of construction and demolition material.

The works are scheduled to commence in June 2019 and will take about 60 months to complete.

Mr. Raymond Cheung

Arup – Mott MacDonald Joint Venture

at 3/F, Mapletree Bay Point, 348 Kwun Tong Road, Kwun Tong, Hong Kong

Telephone No.: (852) 2828 5757

Fax No.: (852) 2827 1823

Email: raymond.cheung@mottmac.com